How To Install A Sewage Pump?

Views: 0     Author: Marketing Department     Publish Time: 2024-07-04      Origin: Shanghai JUSH Pump

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

The installation process of sewage pumps may encounter various problems that affect their normal operation and service life. Common issues include:


Q1:What should be noted for the installation position of sewage pumps?

The installation position should be easy to maintain, as close as possible to the sewage source, and ensure good ventilation and heat dissipation.


Q2.How to install a submersible sewage pump?

Submersible sewage pumps are usually installed in sewage tanks, placed into the tank using lifting equipment, and fixed at the bottom of the tank.


Q3How should the suction pipeline of the sewage pump be arranged?

The suction pipeline should be as short and straight as possible, avoiding sharp bends and undulations to prevent air resistance.


Q4. What sealing issues should be noted in the installation of sewage pumps?

Ensure that the shaft seal and end cover are well sealed during installation to prevent water leakage.


Q5.How to prevent vibration transmission during the installation of sewage pumps?

Install shock absorbers on the foundation and use flexible joints at pipeline connections.


Q6.How to ensure the stability of the sewage pump after installation?

Fix the base and use anti loosening bolts to ensure installation level.


Q7.How to carry out the electrical wiring of the sewage pump?

Connect the power line according to the motor wiring diagram, ensure reliable grounding, and check if the electrical components are functioning properly.


Q8.How to connect the inlet and outlet pipelines of the sewage pump?

Ensure tight pipeline connections, use sealing gaskets to prevent water leakage, and prevent pipeline stress from being transmitted to the pump body.


Q9.How to install the control cabinet of the sewage pump?

The control cabinet should be installed in a dry and ventilated place, away from corrosive gases, for easy operation and maintenance.


Q10.What preparations need to be made before installing the sewage pump?

Check if the pump body and pipelines are intact, prepare necessary tools and materials, and ensure stable power supply.


To ensure the reliable operation of the sewage pump, it should be installed strictly according to the instructions, and regularly maintained and inspected.


OUR COMPANY

JUSH is a modern pump and valve enterprise integrating R&D, production, sales and service.

QUICK LINKS

PRODUCT CATEGORY

CONTACT US

 +86-18930647859          
 Room 402, Block B, Twin Building, Area 668, Xinzhuan Road, Shanghai, China
Leave a Message
Contact Us
Copyright ©️ 2023 Shanghai Jiushi Pump Manufacturing Co., Ltd. Technology by leadong.com Sitemap.